After thorough inspection, wastes with zero impact on the environment are fully crushed and compacted before being put in the landfill.
Unusually for a regular landfill site, this facility is equipped with a leachate collection system.
To prevent pollution from the site, waste is thoroughly inspected and sorted. Each load brought to the site is inspected, to ensure that only permitted items (5 “stable” items) go into the landfill.
In addition to sorting by heavy machinery, we conduct fine sorting by hand to reduce the quantity of landfill waste and ensure recovery of resources.
Overview
Main specifications Constructed in June 2007 | Gravity type retaining wall Leachate collection facility Leachate treatment facility 700 mt/day |
---|

Inspection yard